Free Scaffolding Erection and Dismantling SWMS - pre-filled template

Get SafetyCheck’s Scaffolding Erection and Dismantling SWMS template. It’s prefilled with common tasks, risks and controls, as well as PPE, Emergency Procedures and Communication & Consultation.

The SWMS is free with a subscription to SafetyCheck and can be easily shared digitally or by PDF download.

Tasks included:
  • Site inspection and preparation
  • Delivery of scaffold materials
  • Erecting base scaffold frame
  • Installing planks, rails, and braces
  • Securing and inspecting scaffold
  • Using erected scaffold
  • Dismantling scaffold
  • Cleaning and storing materials
Painting SWMS template image

WHS obligations

Work  Health and Safety (WHS or OHS) obligations, for tradies are critical to ensure workers and businesses stay safe. Tradies must follow workplace safety laws set by each Australian state safe work body which include use of personal protective equipment (PPE), proper training, identify potential hazards. In some cases Safe Work Method Statements (SWMS) are required.

SWMS explained

A Safe Work Method Statement (SWMS) is a document required for high-risk construction work (HRCW). It outlines the specific tasks to be carried out, associated risks, and measures to control these risks. Building and trade contractors, and workers are responsible for adhering to the SWMS. Regular reviews and updates are essential to address any changes in work conditions.

Types of HRCW

There are 13 types of High Risk Construction Work (HRCW) that require SWMS. They include working at heights, in confined spaces, in trenches, using explosives, demolition and more. Some are very common whereas others are specific to certain types of construction and work sites.

SWMS in different states

In Australia, a Safe Work Method Statement (SWMS) is generally used across states and territories to describe a document that outlines high-risk...

read more

How to make your own SWMS

As a small builder in Australia, ensuring the safety of your team and complying with regulations is important so you can keep your team and business...

read more

SWMS made easy

Safe Work Method Statement templates and tools for small aussie trade businesses.